PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting stone panels at the North Elevation.jpg Block work at Corridor 149 Facing South-East.jpg Curtain wall mullions at 2nd floor South Elevation.jpg Installing copper piping at the 3rd floor Facing East.jpg Installing junction boxes outside Stair -4 Facing East.jpg Installing waste and vent piping at the 3rd floor Facing South.jpg Laying block at corridor 149 Facing West.jpg Laying out block at divider wall detention cells Facing East.jpg Black Iron duct work at the 4th Floor Facing Nouth-East.jpg
Previous pageNext page Installing junction boxes outside Stair -4 Facing East
Installing junction boxes outside Stair -4 Facing East